|
|
World Leading Medical Device Manufacture
- Commenced in November 2004.
- Seabrook were involved in the initial design stage which involved requirements gathering and preparation of a specification document.
- Seabrook were the Service Providers in the roll out in 3 Plants worldwide, from initial specification to implementation, testing and support.
- During this time Seabrook lead the multi-site upgrade from Insite3.4 to Insite4.2
Top
- Now operating as Alere, Stirling Medical manufactured Medical Diagnostic Products.
- Seabrook's experience and expertise was utilised in Camstar's Insite to implement the solution in the manufacturing site in Scotland.
- Commenced in November 2006
- Seabrook were the Solution Provider for the entire project from design through to implementation and support.
- The platform was Insite4.1.

- Seabrook provide MES Consulting, Project Management, Design and Development expertise to Biotronik in Berlin.
- This involves the requirements gathering, solution design, detailed design, implementation and testing of the Camstar Manufacturing (InSite) 4.1 and 4.3 solutions in the Medical Device/Telecommunications Device Plant in Berlin.
- It is planned that Seabrook will be involved in the roll-out in 5 subsequent plants.

- Seabrook provides Manufacturing Execution System development and design expertise to the core team on an on-going basis.
- Camstar System Design, Development and Project Managment.
Top

- Part of the Philips Lighting Division, Lumileds manufactures LED's in 3 sites, 2 in Asia, 1 in USA.
- Seabrook resourced managed the Support Team for the Camstar Application, Semisuite 4.3, in the 3 sites.
- Responsible for managing the support of the Application as well as all changes to functionality.
- Provide Camstar Project Management expertise to implement various technical and business solutions.
- The platform is Cmastar Semi Suite 4.3.
Top

- Large Data Processing project.
- Seabook was responsible for the assimilation and consolidation of over 8500 accounts based on key metrics and guidelines.
- Establish a team of 5 qualified accountants and coordinate and manage the team.
- Validate procedures and quality metrics.
- Continuous quality measurement and error management.
- Ensure project deadlines are met.
Top
|
Projects
|
|